India’s 1st under-river metro tunnel to be completed next week in WB


Team Udayavani, May 28, 2017, 6:01 PM IST

New Delhi: The tunnelling work under the Hooghly river, the first such under-river project in the country, to provide metro connectivity between Howrah and Kolkata is slated to be completed next week.

The under-river tunnel is a crucial link for the Railway’s 16.6-km long East-West Metro project in Kolkata. The 520-metre twin tunnel, one east-bound and the other west-bound, is built 30 metre below the riverbed.

Commuters between Howrah and Mahakaran metro stations will be under the river for only about a minute when the metro train will pass through the tunnel at a speed of 80 km per hour.

Of the 16.6-km route of the East-West Metro project, the tunneling covers 10.6 km, of which 520 metre under the river.

The under-river tunnel is being built at an expense of Rs 60 cr while the total cost of the East-West Metro project is estimated at around Rs 9,000 crore.

The tunneling work started in April last year and likely to be completed in the river section shortly, a senior Railway ministry official said. The East-West Metro is scheduled to be operational by August, 2019.

The internal diametre of each tunnel is 5.55 metre and the thickness of the wall is 275 milimetre. The distance between the two tunnels is 16.1 metre.

There will be walkways in the tunnels for evacuation of passengers in case of emergency, the official said, adding it was a challenging task to dig tunnel under the river.

For the Railways, besides the tunnel under the Hooghly river, drilling work is going on for the seven-km-long under- sea route of the Mumbai-Ahmedabad rail corridor to ascertain soil condition for India’s first bullet train path.

Passengers will get the thrill of travelling under the sea at a maximum speed of 350-km-per-hour, another first in the country, near Thane in the upcoming high-speed train project connecting the two metropolis.

Udayavani is now on Telegram. Click here to join our channel and stay updated with the latest news.

Top News

Vinesh secures women’s 50kg Paris Olympics quota for India

Kejriwal stopped taking insulin months before his arrest: Tihar officials claim in report to L-G

Big and powerful people in India, abroad joined hands to remove me from power: Modi

Gundlupet: Elephant calf killed in tiger attack on Bandipur-Ooty National Highway, traffic comes to a standstill

Congress questions Modi govt’s unfair treatment of Karnataka in revenue sharing

Strong anti-incumbency against Modi govt, says Karnataka CM Siddaramaiah

President Murmu expresses deep concern over loss of lives in Odisha boat tragedy

Related Articles More

Kejriwal stopped taking insulin months before his arrest: Tihar officials claim in report to L-G

Loan recovery: Kerala Woman dies after suicide bid

TISS suspends PhD student for alleged misconduct; he plans to appeal decision

‘South se saaf north se half’: Sachin Pilot’s prediction for BJP in Lok Sabha polls

CM Adityanath congratulates successful candidates as UP board exam results are announced

MUST WATCH

Grafting Jack Anil

Heat Illness

Dwarakish death at 81

H. D. Deve Gowda

Aura Cake shop in udupi


Latest Additions

Vinesh secures women’s 50kg Paris Olympics quota for India

Kejriwal stopped taking insulin months before his arrest: Tihar officials claim in report to L-G

Loan recovery: Kerala Woman dies after suicide bid

FIR registered against D K Shivakumar for poll violation, says Election Commission

TISS suspends PhD student for alleged misconduct; he plans to appeal decision

Thanks for visiting Udayavani

You seem to have an Ad Blocker on.
To continue reading, please turn it off or whitelist Udayavani.