Mumbai airport runways to be closed for maintenance work on May 9


PTI, Apr 15, 2024, 6:05 PM IST

Mumbai Airport (credit: PTI)

Mumbai: Mumbai international airport’s two runways will be closed for six hours on May 9 to carry out pre-monsoon maintenance work.
The two runways will be closed for six hours from 1100 to 1700 hours on May 9, airport operator MIAL (Mumbai International Airport Ltd) said in a release on Monday.

“As part of Chhatrapati Shivaji Maharaj International Airport’s (CSMIA) monsoon contingency plan, the primary runway 09/27 and the secondary runway 14/32 will remain temporarily non-operational on 9th May 2024, for pre-monsoon maintenance and repair work,” the release said.

A NOTAM (Notice to Airmen) has already been issued to airlines and other stakeholders in December to plan rescheduling of flights ahead of time.

“Hence, maintenance and repair work of the runway will not impact any flight movement or cause inconvenience to its passengers,” the release said.

The airport has a network of runways, taxiways and aprons encompassing nearly 1,033 acres.

The annual runway maintenance work involves inspection of the runway surface for micro texture and macro texture wear and tear that may have occurred due to day-to-day operations and help strengthen the airside strip, as per the release.

The airport handles around 950 flight movements per day. The runway 09/27 spans 3,448 m x 60 m, and runway 14/32 spans 2,871 m x 45 m.

Udayavani is now on Telegram. Click here to join our channel and stay updated with the latest news.

Top News

No CM can remain absent for long, it’s against national interest: Delhi HC on Kejriwal

Politics behind sexual abuse charges against me and my son, claims MLA H D Revanna

Heatwave threat: Orange alert issued for 17 districts in Karnataka

PCB finalises Lahore, Karachi, Rawalpindi as venues for Champions Trophy

If voted to power, Congress will conduct caste, economic survey: Rahul Gandhi

‘Will PM still remain silent?’ Priyanka Gandhi slams BJP over Hassan ‘sex scandal’

IAF’s Resurgent Challenge in Pursuing Atmanirbharta

Related Articles More

ISRO releases ISSAR 2023 report on vulnerability of space assets to collisions

No CM can remain absent for long, it’s against national interest: Delhi HC on Kejriwal

Court convicts four accused, acquits 10 in 2015 Malvani hooch tragedy

ICG apprehends Indian fishing boat with 173 kg of narcotics; two crew members detained

Ahead of phase 3 polls, Congress and BJP spar in MP over quotas, Muslim appeasement

MUST WATCH

Skin Rash, Causes, Signs and Symptoms

11 bullets found in python’s body!

K. Jayaprakash Hegde Sharing His Memories

Grafting Jack Anil

Heat Illness


Latest Additions

ISRO releases ISSAR 2023 report on vulnerability of space assets to collisions

Hunasagi: MLA Bairati Basavaraj’s car overturned

No CM can remain absent for long, it’s against national interest: Delhi HC on Kejriwal

Cricket for the Blind: A Transformative Journey Empowering Visually Impaired Athletes

China lifts restrictions, gives all clear nod for Tesla cars as Musk lobbies hard in surprise visit to Beijing

Thanks for visiting Udayavani

You seem to have an Ad Blocker on.
To continue reading, please turn it off or whitelist Udayavani.