Bommai asks Centre to fund Rs 4,300 cr Karnataka Optical Fiber Network
PTI, Sep 8, 2021, 4:50 PM IST
Stating that 25,000 government offices and institutions in Karnataka are facing internet connectivity problems, Chief Minister Basavaraj Bommai demanded that the Centre allow setting up of Karnataka Optical Fiber Network (KOFN) and bear the total cost of Rs 4,300 crore.
Bommai made the request during a meeting with Union IT Minister Ashwini Vaishnaw in Delhi on Tuesday. The Chief Minister informed reporters that the previous chief minister had also flagged concerns about the state facing huge challenges in providing reliable G2G and G2C services due to the limitations of Karnataka State Wide Area Network (KSWAN).
”I have requested the minister to increase the network and broadband to the state,” Bommai told reporters. In the meeting, Bommai asserted that there is a need to set up KOFN as the Centre’s BharatNet project has limited reach and availability.
Besides, the chief minister highlighted telcos’ poor presence at gram panchayat level, lack of capabilities of telecom firms to provide connectivity to certain locations from state headquarters to gram panchayat level, as other issues. ”This has led to state not fulfilling the connectivity requirement of about 25,000 government offices and institutions, who are looking forward for a reliable and high-speed network,” he said in a representation made to the Union Minister.
Seeking the Centre’s support for the proposed KOFN, Bommai requested the Union Minister to bear the project cost of Rs 4,300 crore which includes maintenance of the network for 15 years. He also requested the minister to advise BSNL and BBNL to provide one pair of optical fiber core free of cost from Bengaluru headquarter to gram panchayats until the BharatNet PPP modelled network is operational.
Further, the chief minister demanded that the Centre provide 1-2 fiber pairs between Bengaluru headquarter and gram panchayats immediately after operationalisation of the BharatNet project free of cost. ”With this, I once again would urge and request you to kindly consider to fund the project at a total cost of Rs 4,300 crore, exclusive of taxes,” he added.
Sharing the salient features of the proposed KOFN, Bommai said it aims to connect about 25,000 government offices and institutions from the state headquarters to gram panchayats, of which 50 per cent of the offices are present at gram panchayat level. This will help various state departments to access state’s data centre, he said.
Bommai also informed that the proposed KOFN aims to provide robust network connectivity to all the government offices and institutions, while BharatNet is aiming to provide connectivity to citizens at gram panchayat level and beyond including development institutions. Therefore, the project objectives of KFON and BharatNet are completely distinct, he noted.
Udayavani is now on Telegram. Click here to join our channel and stay updated with the latest news.
Top News
Related Articles More
Congress in K’taka to stage protest on Apr 28 against ‘paltry’ drought relief given by Centre
LS Polls 2024: PM Modi hell-bent on ‘revenge’ after K’taka ‘rejected’ him in assembly polls, says Congress
Why didn’t Modi give a single penny to Karnataka drought relief until SC intervened, asks Siddaramaiah
69.56 per cent voter turnout recorded in Karnataka’s first phase of polling
EC orders re-polling in Chamarajanagar LS segment of Karnataka
MUST WATCH
Latest Additions
With impact player, it is getting difficult each and every day: Pant
Congress in K’taka to stage protest on Apr 28 against ‘paltry’ drought relief given by Centre
McGurk, Stubbs rock as DC beat MI by 10 runs
‘Shaurya Smarak’ of three fallen Army officers unveiled in Jammu
BJP drops Poonam Mahajan, picks 26/11 prosecutor Ujjwal Nikam from Mumbai North Central seat