India’s 1st under-river metro tunnel to be completed next week in WB


Team Udayavani, May 28, 2017, 6:01 PM IST

New Delhi: The tunnelling work under the Hooghly river, the first such under-river project in the country, to provide metro connectivity between Howrah and Kolkata is slated to be completed next week.

The under-river tunnel is a crucial link for the Railway’s 16.6-km long East-West Metro project in Kolkata. The 520-metre twin tunnel, one east-bound and the other west-bound, is built 30 metre below the riverbed.

Commuters between Howrah and Mahakaran metro stations will be under the river for only about a minute when the metro train will pass through the tunnel at a speed of 80 km per hour.

Of the 16.6-km route of the East-West Metro project, the tunneling covers 10.6 km, of which 520 metre under the river.

The under-river tunnel is being built at an expense of Rs 60 cr while the total cost of the East-West Metro project is estimated at around Rs 9,000 crore.

The tunneling work started in April last year and likely to be completed in the river section shortly, a senior Railway ministry official said. The East-West Metro is scheduled to be operational by August, 2019.

The internal diametre of each tunnel is 5.55 metre and the thickness of the wall is 275 milimetre. The distance between the two tunnels is 16.1 metre.

There will be walkways in the tunnels for evacuation of passengers in case of emergency, the official said, adding it was a challenging task to dig tunnel under the river.

For the Railways, besides the tunnel under the Hooghly river, drilling work is going on for the seven-km-long under- sea route of the Mumbai-Ahmedabad rail corridor to ascertain soil condition for India’s first bullet train path.

Passengers will get the thrill of travelling under the sea at a maximum speed of 350-km-per-hour, another first in the country, near Thane in the upcoming high-speed train project connecting the two metropolis.

Udayavani is now on Telegram. Click here to join our channel and stay updated with the latest news.

Top News

K’taka water crisis: NGT seeks cricket association’s reply on water sources in Chinnaswamy stadium

SC to consider interim bail to Kejriwal due to LS polls, puts ED to notice

Make polling hours 6am-7pm for May 7 LS polls, K’taka BJP urges EC citing heatwave

Water scarcity: Water rationing introduced in Mangaluru city, Alternate day water supply from May 5

CBSE class 10, 12 board exam results likely to be announced after May 20: Board officials

‘Kallakkadal’ Alert: Coastal parts of Kerala, south Tamil Nadu warned of likely ocean swells

Rape case booked against Prajwal Revanna, says Siddarmaiah

Related Articles More

Rohith Vemula not a Dalit, says police in closure report

SC to consider interim bail to Kejriwal due to LS polls, puts ED to notice

Amit Shah fake video case: Delhi Police arrests Congress member Arun Reddy

India’s reservoirs report water shortage, southern belt worst hit as levels dip to 16%: CWC

Tharoor expresses limited support for dual citizenship proposal

MUST WATCH

Skin Rash, Causes, Signs and Symptoms

11 bullets found in python’s body!

K. Jayaprakash Hegde Sharing His Memories

Grafting Jack Anil

Heat Illness


Latest Additions

K’taka water crisis: NGT seeks cricket association’s reply on water sources in Chinnaswamy stadium

Sexual abuse allegations: More trouble brewing for Revanna, Prajwal

Rohith Vemula not a Dalit, says police in closure report

Malaria infection may accelerate ageing process: Study

Bengaluru to host film festival in honour of Guru Dutt

Thanks for visiting Udayavani

You seem to have an Ad Blocker on.
To continue reading, please turn it off or whitelist Udayavani.