Bullet train: High-speed travel between Ahmedabad, Mumbai by 2022


Team Udayavani, Sep 14, 2017, 1:55 PM IST

Ahmedabad :  India’s first bullet train between Ahmedabad and Mumbai will run at a maximum speed of 350 km per hour, covering the 508-km stretch in under three hours.

The ambitious project, which was today launched by Prime Minister Narendra Modi and his Japanese counterpart Shinzo Abe, would cost around Rs 1.10 lakh crore. Japan is giving a loan of Rs 88,000 crore for the project at a minimal interest of 0.1 per cent.

The government wants to start the services of the proposed Ahmedabad-Mumbai High Speed Rail Network, commonly known as the bullet train on August 15, 2022 to mark India’s 75th year of Independence. The bullet train would run at an average speed of 320 km per hour and at a maximum speed of 350 km per hour.

It will stop at 12 railway stations on the route but only for 165 seconds each. A 21-km-long tunnel will be dug between Boisar and BKC in Mumbai, of which seven km will be under water. The railways will only require around 825 hectares of land for the project as 92 per cent of the route will be elevated, six per cent would go through tunnels and only the remaining two per cent would be on the ground.

The railways would run about around 35 bullet trains when it starts operation with about 70 trips per day. The number of trains would be increased to 105 in 2050. Rail Minister Piyush Goyal, who was present at the event today, said it was an experience in a train that led to changes in Mahatama Gandhi’s life and now it was a train that bound India and Japan in friendship and goodwill.

Goyal had earlier said that the fare of the high-speed bullet train would be “affordable for all”. Initially, the train would have 10 coaches with a total seating capacity of 750 passengers. Later, it is proposed to have 16 coaches with a seating capacity of 1,250 passengers.

The train would have two categories of seats–executive and economy–with the prices comparable with the base AC 2- tier fare of the Rajdhani Express. In the initial days, around 1.6 crore people are expected to travel by the train annually, adding that by 2050, around 1.6 lakh commuters would be travelling by the high-speed train on a daily basis.

The train would require a cleaning time of four hours, after running for 20 hours.

Udayavani is now on Telegram. Click here to join our channel and stay updated with the latest news.

Top News

Siddaramaiah orders SIT probe over alleged sex scandal involving Deva Gowda’s grandson

Auto rickshaw driver brutally murdered in Kozhikode

‘PM has been fighting for Shivaji’s principles’

YSRCP Social Media team diligently connects with voters in Andhra Pradesh

Space enthusiasts ask ISRO chief if agency can find water on moon

Actor Sahil Khan detained by Mumbai SIT in Mahadev betting app case

MDH says its products are safe; rejects pesticide allegations

Related Articles More

Auto rickshaw driver brutally murdered in Kozhikode

PM deflecting from failures, should address real issues, says Chidambaram

Annamalai: A name resonating in Tamil Nadu

Extreme diet? — Brothers die of starvation in Goa, reportedly ‘consumed only one date per day’

YSRCP Social Media team diligently connects with voters in Andhra Pradesh

MUST WATCH

Skin Rash, Causes, Signs and Symptoms

11 bullets found in python’s body!

K. Jayaprakash Hegde Sharing His Memories

Grafting Jack Anil

Heat Illness


Latest Additions

Siddaramaiah orders SIT probe over alleged sex scandal involving Deva Gowda’s grandson

T20 World Cup: Agarkar to have informal selection meeting with skipper Rohit Sharma in Delhi

Archery WC: Indian men’s team upset Olympic champions Korea to bag historic gold after 14 years

PM deflecting from failures, should address real issues, says Chidambaram

Auto rickshaw driver brutally murdered in Kozhikode

Thanks for visiting Udayavani

You seem to have an Ad Blocker on.
To continue reading, please turn it off or whitelist Udayavani.