Hemavati Dam Division issues notice
Team Udayavani, Jul 11, 2018, 5:32 PM IST
Hassan: The officers of Hemavati Dam Division have issued a notice to individuals in the downstream of the dam to move to more secure place expressing that the peak gates of Hemavati reservoir at Gorur could be opened at any time.
In an official statement issued here on Wednesday, the Superintendent Engineer of Hemavati Project Circle said the water level had crossed 2,910 ft. The maximum level of the reservoir is 2,922 ft.
The inflow over the most recent 24 hours before 6 a.m. on Wednesday was 20,535 cusecs. The inflow has been on the ascent because of substantial rains in the catchment zone.
Udayavani is now on Telegram. Click here to join our channel and stay updated with the latest news.
Top News
Related Articles More
Grand premiere of Tulu movie “Tthudarr” in Qatar leaves audience in awe
Mangaluru: Engineering student found dead at hostel; suicide suspected
Shivamogga: Two rowdies hacked to death, situation tense
Siddaramaiah hits out at BJP over appointment to temple festival panel
‘X’ takes down Karnataka BJP’s animated clip on Muslim quota row after EC prod
MUST WATCH
Latest Additions
Grand premiere of Tulu movie “Tthudarr” in Qatar leaves audience in awe
Congress is ‘anti-Ram, anti-Sanatan’: JP Nadda
Mangaluru: Engineering student found dead at hostel; suicide suspected
Actor follows CM Shinde’s convoy at Mumbai sea link to avoid paying toll; held by cops
Shivamogga: Two rowdies hacked to death, situation tense