Andhra Pradesh, Telangana Governor Flags off Metro Rail Service Between Ameerpet and Hi-Tec City


Team Udayavani, Mar 20, 2019, 6:53 AM IST

Hyderabad: The much-awaited metro rail services to Hi-Tec City, the IT hub of Hyderabad, was
inaugurated on Wednesday with Governor of Andhra Pradesh and Telangana E S L Narasimhan flagging off the first service.

The 10-km stretch (Ameerpet to Hi-Tec City) of Metro Rail Corridor-III was launched by the Governor at Ameerpet station.

The stretch with nine stations, including Ameerpet, would establish the crucial Metro Rail connectivity to the highly congested IT/ITES service areas of Hi-Tec City, Madhapur, Gachibowli, Jubilee Hills, Hyderabad Metro Rail Limited (HMRL) officials said.

Regular operations will start from 4 pm Wednesday.

Prime Minister Narendra Modi had inaugurated the 30 km stretch (between Miyapur and Nagole) out of the 72 km long
elevated Hyderabad Metro Rail project, in November 2017.

Another 16-km stretch between Ameerpet and L B Nagar was launched in September last year.

Among the nine stations (Ameerpet-Hi-Tec City stretch), Taruni-Madhura Nagar station is being developed as a women
managed station and in due course would have shops mostly catering to their needs and that of children.

HMRL Managing Director N V S Reddy said the Jubilee Hills checkpost station was a single level one unlike other
stations which are mainly on two levels.

The concourse level was avoided to reduce the already high level of the station due to gradient related problems,he
said.

HMRL officials said trains would initially run on a five km stretch between Jubilee Hills Check Post and Hi-Tec
City station following a traditional railway practice of ‘twin single line method,’

In this method the two tracks are treated as two separate single lines and trains are operated in both ‘up and
down’ direction on each line separately, till the ‘reversal’ beyond Hi-Tec City station is completed.

The officials said initially the frequency of trains between Ameerpet-Hi-Tec City will be nine to 12 minutes as
against six minutes in other parts of the operational Metro corridors.

Efforts are being made to add additional trains in the stretch to improve frequency and to cater to the huge rush
that is expected, they said.

The concessionaire L&T Metro Rail (Hyderabad) Limited is building the Hyderabad Metro Rail project across three
corridors.

Udayavani is now on Telegram. Click here to join our channel and stay updated with the latest news.

Top News

If voted to power, Congress will conduct caste, economic survey: Rahul Gandhi

‘Will PM still remain silent?’ Priyanka Gandhi slams BJP over Hassan ‘sex scandal’

IAF’s Resurgent Challenge in Pursuing Atmanirbharta

Ravi Varma’s ‘hitherto unseen’ portrait of his granddaughter on display in Bengaluru on April 29-30

Focus on KL Rahul to prove himself ahead Indian team selection when LSG take on MI

Stay blessed: Pakistani star Mahira Khan to Arijit Singh after attending singer’s concert in Dubai

LS polls 2024: Setback for Congress in Indore — Party nominee Akshay Bam withdraws candidature

Related Articles More

Around Rs 3,400 crore released to Karnataka for drought management: Centre to SC

Chhattisgarh: 9 killed, 23 injured as goods vehicle collides with truck in Bemetara district

Delhi Police seeks info from social media platforms on source of doctored video of Amit Shah

If voted to power, Congress will conduct caste, economic survey: Rahul Gandhi

Kharge authorised to decide Amethi, Raebareli candidates: Congress

MUST WATCH

Skin Rash, Causes, Signs and Symptoms

11 bullets found in python’s body!

K. Jayaprakash Hegde Sharing His Memories

Grafting Jack Anil

Heat Illness


Latest Additions

Around Rs 3,400 crore released to Karnataka for drought management: Centre to SC

Chhattisgarh: 9 killed, 23 injured as goods vehicle collides with truck in Bemetara district

Delhi Police seeks info from social media platforms on source of doctored video of Amit Shah

If voted to power, Congress will conduct caste, economic survey: Rahul Gandhi

Chitradurga: Murugha Math seer surrenders before court

Thanks for visiting Udayavani

You seem to have an Ad Blocker on.
To continue reading, please turn it off or whitelist Udayavani.