Yogi govt decides to improve power supply in UP


Team Udayavani, Apr 11, 2017, 4:16 PM IST

Lucknow: Chief Minister Yogi Adityanath today ordered 18-hour power supply in villages, 20-hour at tehsil level and in Bundelkhand region besides deciding to ink a pact with the Centre to ensure electricity in all UP villages by 2019.

A meeting of the state cabinet chaired by Adityanath, the second since he assumed office last month, also decided that district headquarters will get 24-hour power supply, Power Minister Shrikant Sharma told reporters here after the three-hour-long meeting.

The chief minister directed the power department to ensure that defective or burnt transformers are replaced expeditiously in rural areas so that agricultural operations do not suffer, he said.

Sharma said the ambitious ‘Power for All’ pact will be signed by Adityanath and Union Power Minister Piyush Goyal here on April 14 to meet the Centre’s target of making the state energy efficient by 2018 and help in ensuring power in all UP villages before 2019.

“It was the order of the Chief Minister that all Shaktipeeths are supplied 24-hour power during Navratris and we have been successful in it…examinations are on and students should get power during the night so that they do not have to suffer,” Sharma said.

The chief minister directed the officials to ensure uninterrupted supply to the villages from 6 in the evening to 6 in the morning so as to help the students prepare for exams.

“It is the dream of BJP chief Amit Shah and the Chief Minister that every house, every poor, and every village get power by 2018,” Sharma said.

On former CM Akhilesh Yadav’s statement that there is nothing new in providing power during Navratri and Ramnavami, he said the earlier roster system was not implemented on the ground and remained restricted to the CM’s residence, Shakti Bhawan and for the VIPs.

“The difference is, our VIPs are poor residing in villages. We will take action against officers if the roster is not implemented at the rural level, which was ignored ealier. The government is working for providing 24-hour power supply by October 2018,” he said.

It has also been decided to change defective transformers within 48 hours not in 72 hours, the time fixed earlier, and 24 hours in urban areas.

Announcing a one-time settlement scheme, Sharma said it was decided to waive surcharge on domestic connection and take only principal amount of the bill.

“For farmers having bills of over Rs 10,000 pending, they will get relief by making the payment in four instalments,” he said.

In a bid to end woes of potato growers, the cabinet decided to purchase 1 lakh metric tonnes of potato at Rs 487 per quintal.

“Government aims at giving adequate price to potato growers. If we cannot give them profit, we want to give them price of their produce,” Sharma said.

For cane growers, the cabinet decided to ensure payment of their current cane dues within 14 days and old dues within 120 days.

“Legal action will also be taken against sugar mills if they fail to make payments,” he said.

Udayavani is now on Telegram. Click here to join our channel and stay updated with the latest news.

Top News

EVMs destroyed as two groups of villagers clash in Chamarajanagar district

Banjarumale hamlet in Belthangady records 100 per cent voting

Board exams twice a year from 2025: MoE asks CBSE to work out logistics, no plan for semesters

Lok Sabha 2024: Tribal hamlet of Banjarumale in Belthangady records 100% voter turnout

Padubidri: Speeding car collides with electric pole, one dead

Bengaluru eateries butter up voter turnout with free dosa

Low voter turnout in Karnataka: Only 38.23% cast votes in 14 LS segments during first half of the day

Related Articles More

Cache of arms including foreign-made revolvers seized by CBI in Sandeshkhali raids

24 Indian Fishermen Released from Sri Lankan Detention, Repatriated to India

SC verdict on EVM tight slap to Congress-led opposition: PM Modi in Bihar rallies

Board exams twice a year from 2025: MoE asks CBSE to work out logistics, no plan for semesters

Akhilesh Yadav accuses BJP of job losses and employment failure

MUST WATCH

Skin Rash, Causes, Signs and Symptoms

11 bullets found in python’s body!

K. Jayaprakash Hegde Sharing His Memories

Grafting Jack Anil

Heat Illness


Latest Additions

Cache of arms including foreign-made revolvers seized by CBI in Sandeshkhali raids

24 Indian Fishermen Released from Sri Lankan Detention, Repatriated to India

Deep-tech drives growing patenting patterns in India; highest filings in Tamil Nadu: Study

Study finds genetic basis for link between depression, heart disease

EVMs destroyed as two groups of villagers clash in Chamarajanagar district

Thanks for visiting Udayavani

You seem to have an Ad Blocker on.
To continue reading, please turn it off or whitelist Udayavani.